Current Projects

GROUP 2 CIPP 

Group 2 CIPP comprises the installation of a Cured-In-Place Pipe (CIPP) liner inside an existing sanitary sewer pipe, digging any necessary point repairs in preparation for CIPP, and rehabilitating/replacing manholes connected to segments being repaired with CIPP. CIPP is a trenchless rehabilitation method used to avoid prolonged disruption to the surroundings, and a typical line segment can be repaired in one to two days.

 

GROUP 2 RELAY

Group 2 Relay comprises a contractor excavating and replacing an existing sewer line from manhole to manhole. This repair method is used when trenchless rehabilitation is not feasible and generally takes between 2 to 3 weeks to complete a segment. Crews work with surrounding neighbors to ensure the work is as minimally disruptive as reasonably possible.

To report urgent information or to get additional information, you can reach us through our INFORMATION LINE

901-452-2385

Bringing improvements to the sanitary sewer system in the City of Memphis over the next 10 years.

QUICK LINKS

  • Safety
  • Manhole Inspection
  • Sewer System Rehabilitation and Repair
  • Closed Circuit Cameras
  • Professor Phil
  • City of Memphis

CONTACT US

ADDRESS 
845 Crossover Lane
Building D, Suite 120
Memphis, TN 38117
EMAIL
memphiswcts@bv.com
PHONE
901-452-2385.

Back to Top